We worked toward finishing our DC panel wiring job. The though-deck connector got wired up.
We launched smoothly and motored for a bit down-lake, passing the barges that are carrying the disassembled old 520 bridge North for demolition. Then we raised sail.
As we were under sail, the connectors were put on the ends of the wires and connected to the fuse panel. Turned on the switches, and there was light and it was good! All that is left is to dress the wires so they are not hanging loose, and connect the VHF radio.
The new anchor light, steaming light, and deck light all worked. After docking, we added the navigation lights connection. All worked just like they were supposed to. All of the lights except the navigation lights are LED, so have minimal draw on the battery. We will replace those bulbs at a later point, so that we are all LED.
The sailing went smoothly. We found a few more rigging issues. We had added the spinnaker sheets, but, as usual, they were not rigged outside everything else. We did not raise the spinnaker, but we wanted them in place, if for no other reason than to get them out of the cabin. We got those routed correctly.
Our boat is running very nicely. We pulled in, and docked. Another nice day on the water.